COCOMOII

一、COCOMOII是什么

   cocomo是 COnstructive COst MOdel(建设性成本估算模型)的缩写.最早是由Dr. Barry Boehm在1981年提出.是一种精确的、易于使用的成本估算方法.

  参考:http://www.cnblogs.com/lzlynn/archive/2007/12/06/985836.html

 

二、COCOMOII简单介绍

  (主要介绍请参考UserManual[英文版的,分享链接中有])

  1)主界面简单介绍

   

 

  • 1
    点赞
  • 0
    收藏
    觉得还不错? 一键收藏
  • 1
    评论
COCOMO评估工具 What is COCOMO? COCOMO (COnstructive COst MOdel) is a screen-oriented, interactive software package that assists in budgetary planning and schedule estimation of a software development project. Through the flexibility of COCOMO, a software project manager (or team leader) can develop a model (or multiple models) of projects in order to identify potential problems in resources, personnel, budgets, and schedules both before and while the potential software package is being developed. The COCOMO software package is based upon the software cost and schedule estimation model: COnstructive COst MOdel version II (COCOMOII). This is the newly revised version of the original COnstructive COst MOdel (COCOMO) first published by Dr. Barry Boehm in his book Software Engineering Economics, Prentice-Hall (1981), and Ada COCOMO (1989) predecessors. The current model is described in [Boehm et al. 1995] The primary objectives of the COCOMOII.1998 effort are: ◾ To develop a software cost and schedule estimation model tuned to the life cycle practices of the 1990's and 2000's. ◾ To develop software cost database and tool support capabilities for continuous model improvement. ◾ To provide a quantitative analytic framework, and set of tools and techniques for evaluating the effects of software technology improvements on software life cycle costs and schedules. The full COCOMOII model includes three stages. Stage 1 supports estimation of prototyping or applications composition efforts. Stage 2 supports estimation in the Early Design stage of a project, when less is known about the project’s cost drivers. Stage 3 supports estimation in the Post-Architecture stage of a project. This version of USC COCOMOII implements stage 3 formulas to estimate the effort, schedule, and cost required to develop a software product. It also provides the breakdown of effort and schedule into software life-cycle phases and activities from the original COCOMO manual. These are still reasonably valid for waterfall model software projects, but need to be interpreted for non-waterfall projects.

“相关推荐”对你有帮助么?

  • 非常没帮助
  • 没帮助
  • 一般
  • 有帮助
  • 非常有帮助
提交
评论 1
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值